 |
|
1st Choice Chillers | Products | Trouble Shooting | Manual | Load
Sizing | Sitemap | Links | Clients | Components | Get a Quote |
|
1.0 | 2.0 | 3.0 | 4.0 | 5.0 | 6.0 | 7.0 | 8.0 | 9.0 | 10.0 | 11.0 | 12.0 | 13.0 | 14.0- |
| |
|
Installation
|
4.0.0 |
Installation |
|
|
|
|
4.1.0 |
You have now determined the desired location of the unit.
The chiller comes with casters and can be rolled into position.
If it is necessary to lift the unit this hould be done by
the bottom frame only. If you must use lifting cables or chains,
be careful not to damage components, controls or pipes. |
|
4.2.0 |
Check to ensure that power supply agrees with nameplate.
Supply voltage must be within plus or minus 10 percent. |
|
4.3.0 |
Power should be supplied through a fused disconnect. |
|
4.4.0 |
Check power source for voltage unbalance. |
| |
1.0 | 2.0 | 3.0 | 4.0 | 5.0 | 6.0 | 7.0 | 8.0 | 9.0 | 10.0 | 11.0 | 12.0 | 13.0 | 14.0- |
|
| |
|
| - |
|
Copyright © 2010 | 1st Choice Portable Chillers | All rights reserved |
1st
Choice Portable Chillers, 111 Esna
Park Drive, Unit 7, Markham, Ontario, L3R 1H2
Toll Free: 1,877. 513. 8310 ~ Email: sales@1stchoicechillers.com |