Fill Tank
5.0.0 |
Fill Tank |
5.1.0 |
DO NOT connect city water supply line directly to reservoir, it has not been designed to withstand pressure. Reservoir is vented to atmosphere, do not change or obstruct vent line during installation. On systems with process piping above reservoir, a stand pipe should be installed on vent line and fill line to a level above the highest point in the system. |
5.2.0 |
A plastic liquid level gauge has been installed on the tank to view water level. |
| Index: 1.0 | 2.0 | 3.0 | 4.0 | 5.0 | 6.0 | 7.0 | 8.0 | 9.0 | 10.0 | 11.0 | 12.0 | 13.0 | 14.0 | |
1st Choice Portable Chillers, 111 Esna Park Drive, Unit 7, Markham, Ontario, L3R 1H2
Toll Free: 1.877.513.8310 ~ Email: sales@1stchoicechillers.com