Pre-Start Up
7.0.0 |
Pre-Start Up |
7.1.0 |
DO NOT switch unit on. Make a complete visual check of unit for possible damage sustained during installation. |
7.2.0 |
WITH POWER OFF Check all terminal screws in control panel, making sure they are tight. |
7.3.0 |
Fill reservoir through fill pipe. Replace fill cap after filling (use our fill cap, it has a vent hole to protect the tank from expansion and contraction). |
7.4.0 |
A minimum of eight (24) hours before start-up and with chiller switch in "off" position, turn on the supply disconnect. This allows the compressor crankcase heater to evaporate the refrigerant in the crankcase oil. |
7.5.0 |
A process heat load must be available to the chiller for start-up. |