Instructional Manual
Your portable chilling system has been carefully assembled and engineered to give trouble free service with a minimum of maintenance. Your unit is
self-protecting by a series of safety controls integrated in the control system. These have been timely set to obtain boh adequate protection and optimum
efficiency from your unit.
Our instruction manual covers most of our chillers and will be useful in the operation of the unit. It covers a wide range of topics from unpacking the unit, to its installation, startup and general operating instrucitons. If there is anything that we forgot, please let us know.
Downlaod the entire
Instruction Manual
| 1.0 | Introduction | 8.0 | Startup |
| 2.0 | Uncrating and Checking Unit For Damage | 9.0 | Trouble Shooting |
| 3.0 | Locating Unit | 10.0 | Pilot Light Panel |
| 4.0 | Installation | 11.0 | Operating Instructions |
| 5.0 | Fill Tank | 12.0 | Maintenance |
| 6.0 | Process Connections | 13.0 | Drawing 1 |
| 7.0 | Pre-Startup | 14.0 | Component Descriptions & Pictures |
| Index: 1.0 | 2.0 | 3.0 | 4.0 | 5.0 | 6.0 | 7.0 | 8.0 | 9.0 | 10.0 | 11.0 | 12.0 | 13.0 | 14.0 | |||
1st Choice Portable Chillers, 111 Esna Park Drive, Unit 7, Markham, Ontario, L3R 1H2
Toll Free: 1.877.513.8310 ~ Email: sales@1stchoicechillers.com